Change, Deviation and Concession Control Policy
Separate changes, deviations and concessions, and approve each one through its own controlled path.
Good for: operations and quality managers approving changes to products, processes, materials and suppliers
Word93 KBVersion 1.0Arabic and EnglishStandard levelUpdated 16 Nov 2026
- Instant download after payment
- Free version updates
- Damaged file? We fix or replace it
- Fixed price, no fake discounts
A material quietly substituted or a setting adjusted with nobody told is a common source of sudden non-conformance. This policy separates the change that alters the standard from the deviation granted before production and the concession requested after it, with an eleven-area impact assessment, an approval matrix by case, a limit on every deviation and written customer approval before any conceded product ships.
Designed for operations and quality managers approving changes to products, processes, materials and suppliers.
After purchase, you receive:
Editable Word files in Arabic and English, and a User Guide (PDF, Arabic and English).
Who it is for
operations and quality managers approving changes to products, processes, materials and suppliers
- The original template file: (Word) fully editable, no watermarks.
- User Guide: (PDF) step by step instructions in Arabic and English.
- Package Content: (PDF) a list of every file you receive.
- Version updates: any update we publish for your version reaches you free, with a notice in your account.
- An invoice: in your name or your company name with your CR.
What's inside
3 files · 93 KB- OPS-030_Change-Deviation-and-Concession-Control-Policy_EN_v1.0.docxDOCX
- OPS-030_Change-Deviation-and-Concession-Control-Policy_AR_v1.0.docxDOCX
- OPS-030-Product-Guide_v1.0.pdfPDF
It includes one User Guide in PDF, in Arabic and English.
Sections in the document (3)
- Introduction
- Main Terms
- Signatures
- Buy and download instantlyThe download link appears on the thank you page and in your account under Orders and downloads.
- Register the licenceEnter the Licence Holder name and the company, entity or project before the first download, from the thank-you page or My licences.
- Read the User GuideTwo minutes is enough to understand the layout and how to fill it in.
- Fill in the yellow highlighted fieldsThe rest of the text is ready and reviewed, and you can adjust it to your needs.
- Need help?Message us on WhatsApp with the SKU and your email address, and we reply by email within one working day.
Only verified buyers can review, and our team checks every review before it is published.
Be the first verified buyer to share your experience with this product.
Does it work on Mac or Google Sheets?
Can I use it for more than one company?
What if a file is damaged or incomplete?
Will I get updates?
Complementary templates
Usually used together with this template for the full picture.
Control how quality documents are approved, issued, changed and withdrawn, and how records are kept.
Match each asset's maintenance strategy to its criticality, from run-to-failure to predictive.
Plan a risk-based annual audit programme with independent auditors and verified closure of findings.
