All templates are delivered instantly after paymentBrowse templates

Sales and Marketing

QuotationView all

Restaurants, Cafes and Food

Recipe Costing SheetView all

Construction and Contracting

Site Daily ReportView all

Courses

Coming soonView all
Save more

Bundles save 40% or more

No fake discounts: the saving is calculated from the real price of every item.

3 files 95 KB

Preview images from the file(3)

Cycle Time and Work Measurement Study

SKU: OPS-024

Measure work cycles and set standard times by a declared method anyone can repeat and review.

Good for: production managers, work study analysts and planners setting standard times for tasks and stations

Word95 KBVersion 1.0Arabic and EnglishStandard levelUpdated 16 Nov 2026

Choose your licence

Register the Licence Holder and the entity before the first download.

Price · Single entity licence
4.900BHD
  • Instant download after payment
  • Free version updates
  • Damaged file? We fix or replace it
  • Fixed price, no fake discounts
Included in these bundlesThis template is not in a bundle yet. Bundles save 40% or more. Browse bundles

Standard times taken from memory or from the fastest operator's best run lead to plans the line cannot meet. This study fixes the method revision, breaks the work into elements, observes ten cycles across operators and shifts, rates performance on the hundred-point scale and justifies each allowance. It then calculates the standard time with a declared formula and a worked example for capacity planning, costing, line balancing and training.

Designed for production managers, work study analysts and planners setting standard times for tasks and stations.

After purchase, you receive:
Editable Word files in Arabic and English, and a User Guide (PDF, Arabic and English).

Who it is for

production managers, work study analysts and planners setting standard times for tasks and stations

Complementary templates

Usually used together with this template for the full picture.

Chosen by the Growth team
Word
Annual Operations and Capacity Plan

Balance annual demand against effective capacity for every line and quarter before the year begins.

4.900BHD
Word
Bottleneck and Flow Study

Identify the station that truly limits output and treat it before spending on new equipment.

4.900BHD
Word
Continuous Improvement Plan

Establish a daily improvement system, from answering staff ideas to standardising what works.

4.900BHD
Price · Single entity licence4.900BHD